Number of defects per function point
October 5, 2010 in Information system, User Satisfaction
Number of defects detected in the software divided by the total number of function points (FP).
October 5, 2010 in Information system, User Satisfaction
Number of defects detected in the software divided by the total number of function points (FP).
October 5, 2010 in Information system, Project Performance
Number of defects detected in the software divided by the total lines of code (LOC).
The most common definition of LOC seems to count any line that is not a blank or comment line, regardless of the number of statements per line.
May 30, 2010 in Information system KPI Owner Enterprise architect KPI Reviewer CIO
Number of applications reused by more than one business, this shows how much effort are going in creating reusable assets.
Industries: ITApril 27, 2010 in Enterprise Architecture, Information system KPI Owner IT manager KPI Reviewer CIO, CTO
Total spend on non-compliant projects as a percentage of total project spending. Non Compliant Projects are those projects which fail to meet the Architecture standards and policies. Architecture standards and policies like Data policies / standards, Information system policies.
Industries: ITApril 27, 2010 in Enterprise Architecture, Information system KPI Owner Enterprise architect KPI Reviewer CTO
Number of development and deployment environments.
Though this metric alone does not give insight into the group objectives. It should be used with other metrics like number of solutions deployed or number of solutions developed over the time.
Industries: ITApril 27, 2010 in Enterprise Architecture, Information system KPI Owner Consultant KPI Reviewer CEO
Number of annual design consulting engagements. Valid for consulting organizations.
Industries: ITApril 27, 2010 in Enterprise Architecture, Information system KPI Owner IT manager KPI Reviewer CTO
Annual savings from errors avoided in design reviews. Should be valued by taking into accounts, the issues identified in reviews and attaching cost parameter to it.
Industries: ITApril 27, 2010 in Enterprise Architecture, Information system KPI Owner IT manager KPI Reviewer CTO
Percentage of projects conducting architecture reviews.
Industries: ITApril 27, 2010 in Enterprise Architecture, Information system KPI Owner CIO KPI Reviewer CEO, CFO
April 25, 2010 in Information system KPI Owner IT manager KPI Reviewer CIO
% of IT investment in Shared Data = IT investment in Shared data / Total IT investment.
Shared data investment is done to leverage the enterprise on shared product, shared customers. and to remove redundant and chaotic information
| % of IT investment in Shared Data |